28 May 2012
TEPCO video of the 26 May 2012 tour shown below:
http://photo.tepco.co.jp/en/date/2012/201205-e/120526-01e.html
TEPCO high-resolution photos of the tour:
http://photo.tepco.co.jp/en/date/2012/201205-e/120528_01e.html
http://photo.tepco.co.jp/en/date/2012/201205-e/120528-02e.html
27 May 2012
Fukushima Daiichi Nuclear Power Station 26 May 2012
These photos are reduced to half-size of the originals. The 16 full-size
originals:
http://cryptome.org/2012-info/daiichi-12-0526/daiichi-12-0526.zip
(18.4MB)
TEPCO report on structural stability of Unit 4, 25 May 2012:
http://www.tepco.co.jp/en/nu/fukushima-np/images/handouts_120525_05-e.pdf
Cryptome Nuclear Power Plant and WMD series:
http://cryptome.org/nppw-series.htm
Fukushima Daiichi Nuclear Power Station 26 May
2012
|
Media persons and Tokyo Electric Power Co. employees look at the company's
tsunami-crippled Fukushima Dai-Ichi nuclear power plant during a press tour
in Okuma town, Fukushima prefecture, Japan, Saturday, May 26, 2012. (Tomohiro
Ohsumi, Pool) |
Reactor buildings from left to right, the No. 1, the No. 2, the No. 3 and
the No. 4, are seen during a press tour at Tokyo Electric Power Co.'s (TEPCO)
Fukushima Dai-ichi nuclear power plant in Okuma, Fukushima prefecture, Japan,
Saturday, May 26, 2012. (Tomohiro Ohsumi, Pool) |
Members of the media and Tokyo Electric Power Co. employees walk in front
of the No. 4 reactor building, rear, crippled by the March 11 earthquake
and tsunami, at the utility company's Fukushima Dai-ichi nuclear power plant
in Okuma, Fukushima prefecture, Japan, Saturday, May 26, 2012. (Tomohiro
Ohsumi, Pool) |
The damaged No. 4 reactor building stands at Tokyo Electric Power Co.'s Fukushima
Dai-ichi nuclear power plant in Okuma, Fukushima prefecture, Japan, Saturday,
May 26, 2012. Japanese Environment and Nuclear Minister Goshi Hosono, accompanied
by the media, has visited the crippled Fukushima Dai-ichi nuclear power plant
to inspect a reactor building and its spent fuel pool at the center of safety
concerns. (Tomohiro Ohsumi, Pool) |
Goshi Hosono, Japan's environment and nuclear minister, third from left,
wearing a red helmet, along with members of the media, walks on the No. 4
reactor building at Tokyo Electric Power Co.'s (TEPCO) Fukushima Dai-ichi
nuclear power plant in Okuma, Fukushima prefecture, Japan, Saturday, May
26, 2012. Japan's environment and nuclear minister Hosono visited the
tsunami-crippled nuclear power plant Saturday to inspect a spent fuel pool
at the center of safety concerns. (Tomohiro Ohsumi, Pool) |
Goshi Hosono, Japan's environment and nuclear minister, inspects the No.
4 reactor building at Tokyo Electric Power Co.'s Fukushima Dai-ichi nuclear
power plant in Okuma, Fukushima Prefecture, Japan, Saturday, May 26, 2012.
The visit by Hosono, apparently aimed at demonstrating the safety of the
facility, came amid renewed concerns about conditions at the plant's No.
4 reactor after its operator reported a bulging of the building's wall. (Toshiaki
Shimizu, Japan Pool) [Yellow reactor containment dome at center background.] |
Workers walk in front of the No. 4 reactor building at Tokyo Electric Power
Co.'s tsunami-crippled Fukushima Dai-Ichi nuclear power plant in Okuma town,
Fukushima prefecture, Japan, Saturday, May 26, 2012. (Tomohiro Ohsumi, Pool) |
An inside view of the damaged No. 4 reactor building is seen at Tokyo Electric
Power Co.'s tsunami-crippled Fukushima Dai-ichi nuclear power plant in Okuma,
Fukushima prefecture, Japan, Saturday, May 26, 2012. (Toshiaki Shimizu, Japan
Pool) |
The inside of the tsunami-crippled No. 4 reactor building is seen during
a press tour at Tokyo Electric Power Co.'s (TEPCO) Fukushima Dai-ichi nuclear
power plant in Okuma, Fukushima Prefecture, Japan, Saturday, May 26,
2012.(Toshiaki Shimizu, Japan Pool) |
Japan's Environment and Nuclear Minister Goshi Hosono, second from left,
inspects a pool containing spent fuel rods inside the No. 4 reactor building
at Tokyo Electric Power Co. 's tsunami-crippled Fukushima Dai-ichi nuclear
power plant in Okuma, Fukushima Prefecture, Japan, Saturday, May 26, 2012.
The pool, located at the top of the building above the reactor, remains one
of the plant's biggest risks due to its vulnerability to earthquakes. (Toshiaki
Shimizu, Japan Pool) |
A pool for spent fuel rods is seen inside the No. 4 reactor building of Tokyo
Electric Power Co.'s tsunami-crippled Fukushima Dai-ichi nuclear power plant
in Okuma, Fukushima prefecture, Japan, Saturday, May 26, 2012. The pool,
located at the top of the building above the reactor, remains one of the
plant's biggest risks due to its vulnerability to earthquakes. (Toshiaki
Shimizu, Japan Pool) |
The No. 3 reactor building is seen at Tokyo Electric Power Co.'s (TEPCO)
Fukushima Dai-ichi nuclear power plant in Okuma, Fukushima prefecture, Japan,
Saturday, May 26, 2012. Japan's environment and nuclear minister, accompanied
by the media, visited the tsunami-crippled nuclear power plant Saturday to
inspect a spent fuel pool at the center of safety concerns. (Tomohiro Ohsumi,
Pool) |
The No. 1, left, and the No. 2, reactor buildings are seen during a press
tour at the tsunami-crippled Fukushima Dai-ichi nuclear power plant of Tokyo
Electric Power Co. (TEPCO) in Okuma, Fukushima Prefecture, Japan, Saturday,
May 26, 2012. (Tomohiro Ohsumi, Pool) |
Workers carry out radiation screening on a bus for a media tour at Tokyo
Electric Power Co. (TEPCO) 's Fukushima Dai-ichi nuclear power plant in Okuma,
Fukushima prefecture, Japan, on Saturday, May 26, 2012. Japan's environment
and nuclear minister, accompanied by the media, visited the tsunami-crippled
nuclear power plant Saturday to inspect a spent fuel pool at the center of
safety concerns. (Tomohiro Ohsumi, Pool) |
A worker carries out radiation screening on a bus for a media tour at Tokyo
Electric Power Co. (TEPCO) 's Fukushima Dai-ichi nuclear power plant in Okuma,
Fukushima prefecture, Japan, on Saturday, May 26, 2012. (Tomohiro Ohsumi,
Pool) |
A worker walks through the building used as crisis management headquarters
at the tsunami-crippled Fukushima Dai-ichi nuclear power plant of Tokyo Electric
Power Co.'s (TEPCO) in Okuma, Fukushima prefecture, Japan, Saturday, May
26, 2012. (Tomohiro Ohsumi, Pool) |
|
|