Spraying Anti-scattering Agents and Survey Result for Unit 1 Building
Cover Demolition. Uploaded to Tepco website 19 December 2014 |
The Upper part of the reactor building(1)
|
The Upper part of the reactor building(2)
|
The Upper part of the reactor building(3)
|
The Upper part of the reactor building(4)
|
Existing steel frames in the upper part of the reactor building(1)
|
Existing steel frames in the upper part of the reactor building(2)
|
Existing steel frames in the upper part of the reactor building(3)
|
Existing steel frames in the upper part of the reactor building(4)
|
Existing steel frames in the upper part of the reactor building(5)
|
Existing steel frames in the upper part of the reactor building(6)
|
The back side of collapsed roofs(1)
|
The back side of collapsed roofs(2)
|
The back side of collapsed roofs(3)
|
The back side of collapsed roofs(4)
|
The back side of collapsed roofs(5)
|
Measurement by infrared thermography
|
Unit 1 being covered 17 September 2011
|
Unit 1 in preparation to be covered 29 August 2011
|
|