Fukushima Daiichi Nuclear Power Station Photos
16
|
Status of iron frame construction for the reactor building cover of Unit
1 at Fukushima Daiichi Nuclear Power Station (pictured on August 10, 2011) |
Following images:
Fukushima Daiichi Power Station Unit 5 and Unit 6 |
Sea water pump (pictured on March 17, 2011) |
Unit 6 side of Unit 5/6 Main Control Room (pictured on March 11, 2011) |
Unit 5 side of Unit 5/6 Main Control Room (pictured on March 11, 2011) |
Flood in Electric Equipment Room of Unit 6 (pictured on March 17, 2011) |
Connection of cable for temporary power source (pictured on July 1, 2011) |
Setting work of submersible pump (pictured on March 17, 2011) |
Setting of submersible pump (pictured on April 22, 2011) |
Work on the roof (pictured on March 18, 2011) |
|