Donate $100 for the Cryptome archive of 65,000 files from June 1996 to the present


12 May 2011. Previous photos and documents: http://cryptome.org/nppw-series.htm

Please do not link these photos to bulletin boards due to bandwidth wastage caused by repetitive downloads.

Videos released by Tepco:

Status of the Spent Fuel Pool of Unit 3 of Fukushima Daiichi Nuclear Power Station: http://www.tepco.co.jp/en/news/110311/images/110510_1.zip (30MBy)

Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station: http://www.tepco.co.jp/en/news/110311/images/110508_2.zip

Status of Improved Working Environment Inside of Reactor Building of Unit 1

First Floor of Turbine Building of Unit 1 (video on May 6th, 2011):
http://www.tepco.co.jp/en/news/110311/images/110508_1.zip


Fukushima Daiichi Nuclear Power Plant Photos 15


Fukushima Daiichi Nuclear Power Plant Photos 15

The following 12 photos are excerpted and enlarged from 70 posted to Flickr on May 10, 2011 by "xtcbz." Date of the photos unknown.

http://www.flickr.com/photos/xtcbz/sets/72157626687253144/with/5705368411/

The 70 photos Zipped: http://cryptome.org/eyeball/daiichi-70/daiichi-70.zip (9MB)

[Image]

Unit 3. (xtcbz)

[Image]

Unit 3. (xtcbz)

[Image]

Unit 3. (xtcbz)

[Image]

Unit 3. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 4. (xtcbz)

[Image]

Unit 1. (xtcbz)

[Image]

Unit 1. (xtcbz)

[Image]

In this photo released by Tokyo Electric Power Co. via Kyodo News, the sun's rays stream into the interior of the No. 3 reactor building at the tsunami-crippled Fukushima Dai-ichi nuclear power plant in Okuma town, Fukushima Prefecture, northeastern Japan, Wednesday, May 11, 2011. (Tokyo Electric Power Co. via Kyodo News)

[Image]

A model of a nuclear reactor pressure vessel (left, full; right, bottom). May 12, 2011. (Tokyo Electric Power Co.)

[Image]

Inspection Status of the Indicator (Water level indicator A, fuel area) at Unit 1, Fukushima Daiichi Nuclear Power Station pictured on May 10th, 2011. May 12, 2011. (Tokyo Electric Power Co.)

[Image]

[Filling pit in the following photo with concrete.] The situation of water stop at the pit near the water intake canal of Fukushima Daiichi Nuclear Power Station Unit 3 pictured on May 11th, 2011. (Tokyo Electric Power Co.)

[Image]

The situation of inflow to the pit near intake canal of Fukushima Daiichi Nuclear Power Station Unit 3 pictured on May 11th, 2011. (Tokyo Electric Power Co.)

[Image]

Northwest side of the first floor, Fukushima Daiichi Nuclear Power Station Unit 1 pictured on May 9th, 2011. (Tokyo Electric Power Co.)

[Image]

North side of the second floor, Fukushima Daiichi Nuclear Power Station Unit 1 pictured on May 9th, 2011. (Tokyo Electric Power Co.)

[Image]

Status of the Spent Fuel Pool of Unit 4 of Fukushima Daiichi Nuclear Power Station. May 8, 2011. (Tokyo Electric Power Co.)

[Image]

Inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 (Measurement of radiation dose) pictured on May 5th, 2011. (Tokyo Electric Power Co.)

[Image]

[Above and three below] Situation of duct installation inside the reactor building of Fukushima Daiichi Nuclear Power Station Unit 1 (Photo taken from inside the building toward the double-entry doors) pictured on May 5th, 2011. (Tokyo Electric Power Co.)

[Image]

[Image]

[Image]