A knowledgeable person states: "Project 377 appears to be CARBOY II and is
a processing system for intercepted wideband civil communications from which
fax and telegraph signals are extracted; the latter can be either TDM or
FDM. It is based on a cluster of DEX VAX 11-780 mini-computers and special
purpose hardware. It is, therefore, most probably a component of Echelon
and would be directed at western rather than eastern communications. The
reference to DICTIONARY is probably not to our favourite computers."
Echelon: P377 Work Package for CARBOY II
INTERDEPARTMENTAL COMMUNICATION P-377 SOFTWARE MEMORANDUM NO. 83-11
TO: D. L. Fish DEPT./ 62-K5 BLDG./195D PLANT/ 1 DATE 3 Oct 83
ORGN. ZONE FAC.
FROM: W. J. HILL DEPT./ 62-K5 BLDG./195D PLANT/ 1 EXT. 2-7791
ORGN. ZONE FAC.
SUBJECT: P377 Work Package 3 Support
The attachments to this memo contain the WBS and related change codes for
Work Package 3. The following additional information is provided to help
understand the WBS charge code relationships that I have set up for CPR
reporting:
WBS Charge Number Description Resp Person
--- ------------- ----------- -----------
1.3.1 C1-C5C1-1W00 WPM Tech Direction/Coord Hill/Provence
Bullets 1-10
1.3.1 C1-C5C1-2W00 WPM CPR Reporting Hill
Bullets 11-14
1.3.2 C1-C5C2-1W00 S/W Test Planning Provence
Bullets 1, 2, 5, 7
1.3.2 C1-C5C2-2W00 ADPE Test Planning Damme/Okada
Bullets 3, 4, 5, 6
1.3.3 C1-C5C3-1W00 ADPE Design Damme/Okada
Bullets 1-7, 9
1.3.3 C1-C5C3-2W00 ADPE Installation Damme/Okada
Bullet 8
1.3.4 C1-C5C4-0W00 Software Development Lab Newsham
Bullets All
1.3.5 C1-C5C5-0W00 System Software Support Assignee
Bullets All
1.3.6 C1-C5C6-1W00 Plans & Manuals (A014, Assignee
Bullets 1, 2, 3, 4, 8 A021, B003-2, D028) Rigsby [by hand]
1.3.6 C1-C5C6-2W00 Reports, Orders, Schedules Assignee
Bullets 3, 5, 6, 7, 9 A004, A005, C003, ECP's
1.3.7 C1-C5C7-0W00 ADPE Support Materials Damme/Newsham
Bullets 1, 3, 4 (Work Package 3 Materials
Requests for WP 3 PBOM)
The selection of responsible persons for WBS tasks has been somewhat
unilateral to this point because the only support that has been required
form within your group was part-time effort from Ken Damme and Edwin
[page ends]
Program P-377
Work Order/Work Authority Structure (cont)
Work
Work Work Author- Resp
WBS Package Order ity Orgn Description
1.3 03 C1-C5CX Comp S/W Eng Mgmt
1.3.1 C1-C5C1 AC03 Work Pkg Mgmt
1.3.1.1 -1W00 Tech Dirction/Coord
1.3.1.2 -2W00 CPR Rpt
1.3.1.3 Subcontract Mgmt
1.3.1.3.1 -3B10 DEC Hdwe
1.3.1.3.2 -3B20 DEC Maint
1.3.1.3.3 -3B30 ACC (FEP)
1.3.2 C1-C5C2 AC03 Sys S/W Test Plng
-1W00 S/W Test Plng
-2W00 ADPE Test Plng
1.3.3 C1-C5C3 AC03 ADPE Des Supp
-1W00 ADPE Design
-2W00 ADPE Installation
1.3.4 C1-C5C4 -0W00 AC03 S/W Devel Lab
1.3.5 C1-C5C5 -0W00 AC03 Sys S/W Support
1.3.6 C1-C5C6 AC03 Documentation
-1W00 Plans & Manuals
-2W00 Rpts, Orders & Scheds
1.3.7 C1-C5C7 AC03 ADPE Procurement
-See Mfg WO/WAS Mfg Fab & Assy
-0W00 ADPE Support Matls
-SUBM SUBS DEC S/C--Maint
-SUB5 SUBS DEC S/C--Hdwe
-SUB6 SUBS ACC S/C-FEE
1.4 04 C1-C5DX System DT&E
1.4.1 C1-C5D1 AD04 Work Pkg Mgmt
-1T00 Tec Dirction/Coord
-2T00 Equip. Control
-3T00 CPR Rpt
2
08-17-83 03478-81
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: WORK PACKAGE MANAGEMENT
WBS CODE: 1.3.1 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o Perform technical administration of Work Package in developing, organizing
defining, and overseeing work to be accomplished.
o Conduct internal audits and compliance reviews
o Interface with other work packages
o Principal software interface with Customer on software engineering
o Support PDRs/CDRs and Engineering design review as required
o Conduct, support, and participate in managemnet level meetings, briefings,
and reviews
o Prepare and modify Work Package documentation
o Provide Software representation on the Program Configuration Change board.
o Provide for Subcontract Management Support to procure DEC computers
o Provide for Subcontract Management Support to place the DEC maintenance
contract.
o Maintain technical and administrative control of assigned cost accounts and
authorized task package efforts.
16
LMSC/CB00221/B
WBS TITLE: WORK PACKAGE MANAGEMENT (Cont)
o Prepare task packages within the constraints of the authorized budget and
schedule based upon the rolling-wave concept established for the program.
o Monitor task package performance, determine earned values and take
corrective action as necessary.
o Prepare variance analysis reports as required.
The fourth level WBS areas of costing are:
1.3.1.1 Technical Direction/Coordination
1.3.1.2 C/SCSC Report
1.3.1.3 Subcontract Management
See 1.3 for CDRL requirements.
17
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: SYSTEM SOFTWARE TEST PLANNING
WBS CODE: 1.3.2 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o Perform DT&E Phase I software test planning for levels 1 and 3
o Support DT&E Phase II and III test planning
o Prepare the ADPE Vendor Acceptance Test Plan (VAT) and coordinate the
planning activtites
o Prepare the ADPE vendor acceptance test procedures, coordinate the testing,
and provide test notification
o Participate in and support test planning meetings, briefings, and schedule
coordination as applicable
o Prepare ADPE VAT test analysis reports
o Review and approve test procedures
The fourth level WBS areas of costing are:
1.3.2.1 Software Test Planning
1.3.2.2 ADPE Test Planning
See 1.3 for CDRL requirements.
18
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: AUTOMATIC DATA PROCESSING EQUIPMENT (ADPE) DESIGN AND SUPPORT
WBS CODE: 1.3.3 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o Design and development of system level ADPE architecture and intger-CPC
communication
o Design and development of subsystem ADPE configuration
o Development and matching of interface between ADPE and special purpose
hardware
o Consultation and technical expertise on computer system hardware performance
capabilities and characteristics
o Procurement of ADPE system hardware for CARBOY II
o Responsible Equipment Engineering (REE) efforts to guide and status ADPE
procurement and maintenance agreement activities
o Participate in and support meetings and briefings as applicable
o Installation and checkout of ADPE system hardware
o Draft modifications to ADPE engineering drawings and produce sketches of new
ADPE engineering drawings to meet CARBOY II requirements
19
LMSC/CB00221/B
WBS TITLE: AUTOMATIC DATA PROCESSING EQUIPMENT (ADPE) DESIGN AND SUPPORT (Cont)
The fourth level WBS areas of costing are:
1.3.3.1 ADPE Design
1.3.3.2 ADPE Installation
See 1.3 for CDRL requirements.
20
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: SOFTWARE DEVELOPMENT LAB (SDL)
WBS CODE: 1.3.4 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o SDL planning, scheduling, and management
o Operation of the SDL equipment such as:
- VAX 11-780 including console terminals
- Disk packs
- Mount tapes
- CADAM (Stand-alone) terminals
- Management Data Processing (stand-alone) equipment
o Maintain tape/data library
o Maintain online libraries and files
o Participate in and support meetings and briefings as applicable
o Provide for software configuration control
o Provide for identification and procurement of any new SDL CARBOY II related
hardware or software
o Maintain equipment documentation library and support the procurement of new
equipment or software documentation for CARBOY II
o Provide labeling of magnetic tape for data interchange
o Maintain all SDL hardware and software
See 1.3 for CDRL requirements.
21
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: SYSTEM SOFTWARE SUPPORT
WBS CODE: 1.3.5 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o Provide consultation and technical expertise on computer system software
performance
o Provide consultation and technical expertise on computer system software
capabilities and characteristics
o Participate in and support meetings, briefings, customer reviews as
applicable to CARBOY II software
o Design, develop, implement, document, and maintain special-purpose system
software
o Provide system generations for all CARBOY II general purpose computers
o Provide for software upgrades for all CARBOY II vendor supllied software
See 1.3 for CDRL requirments.
22
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: DOCUMENTATION
WBS CODE: 1.3.6 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide the following
tasks.
o Update and maintain the Software Engineering Program Implementation Plan
o Update and maintain the Software Standards and Practices Manual
o Participate in and support meetings, briefings, and customer review as
applicable
o Update and maintain the System Software Design Plan
o Produce Conference Reports as required
o Produce monthly project status report inputs for Work Package 3
o Produce periodic Software Management (CPR) Reports and schedules
o Draft inputs to the commercially available computer data report
o Draft inputs to Engineering change Orders for ADPE and/or system software
The fourth level WBS areas for costing are:
1.3.6.1 Plans and Manuals
1.3.6.2 Reports, Orders, and Schedules
See 1.3 for further CDRL requirements.
23
LMSC/CB00221/B
WBS DICTIONARY
WBS TITLE: AUTOMATIC DATA PROCESSING EQUIPMENT (ADPE)
WBS CODE: 1.3.7 DATE: 01 Apr 82
REVISION DATE: 12 Aug 83
ELEMENT DESCRIPTION:
This is a level 3 WBS element covering the effort required to provide, acquire and
consolidate the follwing ADPE activities:
o ADPE analyst support
o Communications software
o ADPE for work packages:
WP 9 - Frequency Division Multiplex Telegraphy Procesing Subsystem
(FDM TPS)
WP 10 - Time Division Multiplex Telegraphy Processing Subsystem (TDM TPS)
WP 12 - Facsimile Processing Subsystem (FPS)
WP 13 - Telegraphy Message Processor (TMP) Subsystem
WP 14 - Local Management Subsystem (LMS)
WP 16 - Communications Handling Subsystem (CHS)
WP 29 - Remote Management Subsystem (RMS)
o ADPE maintenance requirements for hardware and software in the staging and
site areas
The fourth level WBS areas of costing are:
1.3.7.1 Support Materials
1.3.7.2 Subcontract Procurement
1.3.7.3 Manufacturing Fabrication and Assembly
See 1.3 for CDRL requirements.
24
Hill [by hand]
INTERDEPARTMENTAL COMMUNICATION
YY51724-83
TO: A. L. Kerwick DEPT./ BLDG./ PLANT/
ORGN. 25-39 ZONE 104 FAC. 1 DATE 26 Sept. 1983
FROM: J. R. Gilbert DEPT./ BLDG./ PLANT/
ORGN. 60-60 ZONE 150 FAC. 1 EXT. 24910
SUBJECT: MR SIGNATURE AUTHORITY - P377
This is to authorize the following personnel to sing Material Requests
(MRs) for P377 charge numbers. This IDC supercedes all previous ones.
All MRs
H. F. Harper X
M. S. Hipple X
J. H. Gilbert X
A. Washington X
P377 Charge Numbers
C-C5XX - Acquisition Contract
[Signature]
J. R. Gilbert
Program Manager, P377
JRG:sh